CENTRAL VALLEY AG

Monroe, NE

GRAIN FACILITY EXPANSION

 

  • Remodeled the existing rail reclaim system in additional to adding new 65K BU/HR Bulkweigher and 60K BU/HR Shipping bucket elevator leg
  • Installed electric percentile gates to all the rail reclaim system
  • New 20K BU/HR Receiving pit with 20K BU/HR Scalper
  • (3) New 176,616 concrete silos with 60k BU/HR rail reclaim system
  • (1) 3,000 BU truck loadout/rail over flow bin
  • Dust system of new receiving pit and rail load out
  • Removed open reclaim belt in existing silos and reclaim with new Enclosed belt conveyor
  • Add 20K receiving to existing concrete silos
  • Dust collection on new 20K receiving and on rail loadout
  • Tied in one of the concrete silos to the drying system.